MODULAR POWER
SYSTEMS.
Our Engineers can produce & deploy at great speed, we can support a variety of industries that are disconnected, off-grid, or require emergency backup power; including...
99.999% with N+2 redundancy
SPEED TO POWER, MINIMIZED RISK & REDUCED ENVIRONMENTAL IMPACT
Natural Gas Generators
We work with Caterpillar. An established and proven company with 90+ years of reliability & Service with 24/7 global parts availability & Service network.
Commercial Off-The-Shelf Components (COTS)
Our Rectifiers, batteries & controls are built to industry standard with commercial guarantees. Multiple US suppliers for every component means no single source risk.
Patented Architecture, Not Proprietary Hardware
Our innovation is in how we integrate proven components, Load balancing software and fault tolerance ensures you get cutting-edge efficiency without bleeding-edge risk.
Cleaner For Your Community
Catalytic converters are optional inclusions for reducing up to 95% CO2, 98% NOx & 98% CO. Our patent pending output is DC native, meaning less potential heat exchange inside & this means less power & water usage.
Financial Model Simulator
What would an Ingenev power plant cost you over 20 years?
- These calculations are an assumptive model based on EIA State data and are indicative only. Demand charges and incentives are not included.
- Costs are in today's dollars, accumulated over 20 years with zero discounting. All stated costs are subject to change and are not to be construed as a full and final amounts.
- Grid option: utility connection ($0.75M/MW), backup generator ($0.75M/MW), 60-minute N+1 UPS ($0.85M/MW), maintenance, UPS battery replacements, and grid energy.
- Ingenev option: on-site natural gas plant with built-in battery (7.5 min), gas line, O&M from year 2, and natural gas fuel. Battery replacement is covered in the O&M fee.
Grid option vs Ingenev option figures are meant to demonstrate an approximate comparison for a new build or replacement. Every figure is an estimate with a ± 15% band.
Advanced Engineering AssumptionsClick to expand
Ingenev costs less from day one: its upfront cost is below the grid option's.
Separate from the 20-year cost comparison. Ingenev delivers up to 70 MW in 18 months, subject to permitting.
RECEIVE A MORE DETAILED FINANCIAL MODEL & REPORT BY CONTACTING ONE OF OUR ENGINEERING TEAM MEMBERS.
By adding your details below, you will receive a response from our team to further scope your model based on your inputs. To protect proprietary modeling methodology and your data requirements we will reach out and connect to discuss.
THE DC-INGEN.
CONTAINERIZED...
Use the slider to pull apart the 40 foot Caterpillar gas 3520 generator and the 20 foot Proprietary DC-INGEN.





